郭建飞.WQ水利枢纽工程施工交通设计[J].广东水利水电,2018,(3):61-65 |
WQ水利枢纽工程施工交通设计 |
Construction Traffic Design of WQ Water Control Project |
投稿时间:2017-01-10 最后修改时间:2017-02-03 |
DOI:10.11905/j.issn.1008-0112.2018.03.013 |
中文关键词: 施工交通设计 道路 交通洞 临时钢桥 |
英文关键词: construction traffic design road traffic tunnel temporary steel bridge |
基金项目: |
|
摘要点击次数: 16 |
全文下载次数: 16 |
中文摘要: |
WQ水利枢纽工程水工建筑物均布置于右岸,施工交通布置较为困难。通过道路、桥梁与交通洞相互结合,能够很好的实现本工程施工交通设计,并服务于工程现场。 |
英文摘要: |
WQ hydraulic project hydraulic engineering buildings are arranged on the right bank, and construction traffic arrangement is difficult. Through the combination of roads, bridges and traffic holes, the construction traffic design of this project can be realized, and the engineering site is served. |