林志鸿.乐昌峡水利枢纽营区拦水坝及排洪设施施工技术综述[J].广东水利水电,2018,(4):47-51, 59
乐昌峡水利枢纽营区拦水坝及排洪设施施工技术综述
Construction Technique of Dam and Drainage Facilities in Lechangxia Hydro-Junction Project Camp
投稿时间:2017-12-08  最后修改时间:2018-03-23
DOI:10.11905/j.issn.1008-0112.2018.04.010
中文关键词: 乐昌峡  水利工程  拦水坝  排洪设施  施工
英文关键词: Lechangxia hydro-junction project  hydraulic engineering  dam  drainage facilities  construction
基金项目:
作者单位
林志鸿 广东省乐昌峡水利枢纽管理处,广东 乐昌 512200 
摘要点击次数: 113
全文下载次数: 125
中文摘要:
      乐昌峡水利枢纽营区位于坝址左岸上游1 km处,该场地为拦河坝坝肩边坡开挖弃渣填筑而成,整体稳定性较差,排洪设施布置及施工应充分考虑地质、水文、交通等条件,通过枢纽营区修建拦水坝、排洪沟及排水管网系统等永久性排水设施,将北溪冲沟水和地表水流导向武江河,解决了大面积填筑场地水土保持及稳定问题。
英文摘要:
      The camp of Lechangxia Hydro-junction is located 1km upstream of the left bank of the site, but the site is made to block the slope of the dam on the side of the dam, and the whole stability is poor. The layout and construction of the drainage facilities shall be fully considered in the conditions of geology, hydrology and transportation. In this paper, the permanent drainage facilities for the construction of dam, drainage and drainage network system are discussed in this paper.It is very good to solve the problem of soil and water conservation and stability in large area.